If all other factors remain the same, when finished goods inventory investment is increased, service
levels typically will:
A.
remain the same.
B.
increase in direct (linear) proportion.
C.
increase at a decreasing rate.
D.
increase at an increasing rate.
Correct Answer: C
Explanation:
Increasing finished goods inventory investment will improve service levels by reducing the probability
of stockouts. However, the relationship between inventory and service level is not linear, but rather
asymptotic. This means that as inventory increases, service level increases at a decreasing rate,
approaching a maximum value. Therefore, option C is correct. Option A is incorrect because service
level will not remain the same when inventory changes. Option B is incorrect because service level will
not increase in direct proportion to inventory. Option D is incorrect because service level will not
increase at an increasing rate as inventory increases. Reference: CPIM Part 2 Exam Content Manual,
Version 8.0, Section A: Demand Management, Subsection A.3: Demand Management and Customer
Service, p. 10.
Question #2 (Topic: demo questions)
Given the following data, calculate the appropriate takt time:
Metric
Value
Production weeks per year
48 weeks
Available production time per day
10 hours
Average daily demand
2,400 units
Average crew size
2 employees
A.
0.25 minutes
B.
1 minute
C.
2 minutes
D.
4 minutes
Correct Answer: B
Explanation:
Takt time is the rate at which a product should be produced to meet customer demand. It is
calculated by dividing the available production time by the customer demand. In this case, the
available production time is 10 hours per day, and the customer demand is 2,400 units per day.
Converting 10 hours to minutes gives us 600 minutes of production time per day. So, takt time = 600
minutes / 2400 units = 0.25 minutes per unit. However, this is not one of the answer choices, so we
need to look for more information or context.
Question #3 (Topic: demo questions)
Under which of the following conditions is excess capacity most likely a good substitute for safety
stock?
A.
The cost of excess capacity is less than the cost of an additional unit of safety stock in the same period.
B.
The cost to maintain one unit in inventory for a year is less than the direct labor cost.
C.
The service level with safety stock is more than the service level with excess capacity.
D.
Lead time for the product is longer than customers are willing to wait.
Correct Answer: A
Explanation:
Excess capacity is the amount of capacity that is available beyond the normal or expected demand.
Safety stock is the inventory that is held to protect against uncertainties in demand, supply, or lead
time. Excess capacity can be a good substitute for safety stock when the cost of excess capacity is less
than the cost of an additional unit of safety stock in the same period. This means that the opportunity
cost of having idle resources is lower than the carrying cost of holding extra inventory. In this case,
excess capacity can be used to produce more units in response to demand fluctuations, rather than
relying on safety stock to meet customer orders. Reference:
• [CPIM Part 1 Learning System, Module 4: Inventory Management, Section 4.2: Inventory
Management Policies and Objectives]
• [CPIM Part 2 Learning System, Module 1: Supply Chain Strategy, Section 1.3: Capacity
Management]
Question #4 (Topic: demo questions)
A company has a demand for 30 units of A, 40 units of B, and 50 units of C. These products are
scheduled to run daily in batches of 10 as follows: ABC, ABC, ABC, CBC. What is this scheduling
technique called?
A.
Mixed-model
B.
Matrix
C.
Synchronized
D.
Line balancing
Correct Answer: A
Explanation:
Mixed-model scheduling is a technique that allows multiple products to be produced on the same
assembly line without changeovers, and then sequences those products in a way that smoothes the
demand for upstream components12. In this case, the company is using mixed-model scheduling to
produce three different products (A, B, and C) on the same line, and then alternating them in a
pattern that minimizes the variation in the workload and the inventory levels. The other options are
not correct because:
• Matrix scheduling is a technique that assigns tasks to workers based on their skills and
availability3.
• Synchronized scheduling is a technique that coordinates the production and delivery of
materials and components to match the demand of the final assembly4.
• Line balancing is a technique that distributes the workload evenly among the workers or
machines on a production line5. Reference := 1 Create Mixed Model Flow in 5 Steps | Industrial
Equipment News 2 Mixed Model Scheduling - Mountain Home Academy 3 Matrix Scheduling - an
overview | ScienceDirect Topics 4 Synchronized Scheduling - an overview | ScienceDirect Topics 5
Line Balancing - an overview | ScienceDirect Topics
Question #5 (Topic: demo questions)
The primary benefit that results from the cross-training of employees is:
A.
improved flexibility.
B.
improved capacity.
C.
shortened lead time.
D.
effective problem-solving.
Correct Answer: A
Explanation:
Cross-training employees is the process of training employees for skills and job roles they weren’t
initially hired for. This allows them to switch between different tasks and roles when needed, which
increases the flexibility and adaptability of the workforce. Cross-training also enhances the problem
solving, communication, and collaboration skills of the employees, but the primary benefit is
improved flexibility12 Reference: 1: 9 Major Benefits of Cross-Training Employees Effectively 2:
Employee cross-training: 8 benefits you can’t afford to miss