A project team is deciding on the impact of a proposed concrete walkway. Which of the following will be impacted as a result of adding the walkway?
A.
Site's impervious cover
B.
Project density calculations
C.
Erosion and sediment control plan during construction
D.
Air quality as a result of off gassing that occurs as concrete cures
Correct Answer: A
Explanation:
Adding a concrete walkway will increase the site’s impervious cover, which is the percentage of the site area that does not allow water to infiltrate into the ground1. Impervious cover can affect the site’s stormwater management, heat island effect, and habitat quality. The project team should consider using permeable paving materials, vegetated roofs, or rain gardens to reduce the impervious cover and mitigate its impacts2. The other options are not directly impacted by adding a concrete walkway. Project density calculations are based on the floor area ratio and the number of occupants, not the site features3. Erosion and sediment control plan during construction is required for any site disturbance, regardless of the type of material used4. Air quality as a result of off gassing that occurs as concrete cures is not a significant issue for outdoor applications, and can be minimized by using low-emitting concrete products5.
Question #2 (Topic: demo questions)
What is the basis of energy consumption in determining the percentage of green power or carbon offsets?
A.
Quality
B.
Quantity
C.
Efficiency
D.
Performance
Correct Answer: B
Explanation:
B. Quantity is the correct answer because the percentage of green power or carbon offsets is determined based on the amount (quantity) of energy consumed. Organizations calculate how much energy they use and then purchase an equivalent percentage of green power or carbon offsets to match that consumption. The calculation is based on measurable energy quantities (such as kilowatt-hours), not on the quality, efficiency, or performance of the energy source.
Question #3 (Topic: demo questions)
When the LEED AP is applyingthe Integrative Process to a Building Design and Construction project, which of the following information is required to be present in the Owner's Project Requirements (OPR)?
A.
All applicable codes and standards
B.
Interior finishes related to the project
C.
All project team members and applicable roles
D.
Energy efficiency goals and training requirements
Correct Answer: D
Explanation:
According to, page 11, scenario based risk identification involves “creating different scenarios based on varying assumptions about how events might unfold”. This can help explore alternative ways to achieve an objective under different circumstances. Energy efficiency goals and training requirements are required to be present in the Owner’s Project Requirements (OPR) when applying the Integrative Process to a Building Design and Construction project. According to the LEED v4 BD+C Reference Guide, the OPR is a document that details the ideas, concepts, and criteria that are determined by the owner to be important to the success of the project 1. The OPR must include, among other things, the following information related to energy efficiency 1: • • • • • The owner’s energy performance goals and expectations The owner’s requirements for energy metering and monitoring The owner’s requirements for energy modeling and analysis The owner’s requirements for commissioning and verification The owner’s requirements for training and documentation The other options are not required to be present in the OPR, as they are either related to other aspects of the project, such as codes and standards, interior finishes, or project team members, or they are not relevant to the Integrative Process, which focuses on early analysis of energy, water, and site systems 2. References: LEED v4 BD+C Reference Guide, Integrative Process Category, IPc Integrative Process, page 632
Question #4 (Topic: demo questions)
What is the minimum number of members of the integrated project team for the Integrative Process Prerequisite, Integrative Project Planning and Design?
A.
One
B.
Two
C.
Four
D.
Six
Correct Answer: D
Explanation:
D. Six is the correct answer because the Integrative Process Prerequisite: Integrative Project Planning and Design requires a multidisciplinary integrated project team with representatives from key areas of the project. A minimum of six team members ensures that important perspectives such as architecture, mechanical systems, electrical systems, construction, operations, and ownership are included in the planning and design process. This collaborative approach helps identify opportunities for improving building performance, sustainability, and overall project outcomes from the earliest stages of development.
Question #5 (Topic: demo questions)
Adesign team is pursuing Indoor Environmental Quality Credit, Indoor Air Quality Assessment. The building is 1,000 ft2 (93 m2) and has a 10 ft. (3 m) ceiling height. In order to earn the credit, what is the required volume of supply air for the entire building flush-out?
C is the correct answer because the Indoor Environmental Quality (IEQ) Credit for Indoor Air Quality Assessment requires a total building flush-out based on a standard of 14,000 cubic feet of outdoor air per square foot of floor area. Since the building area is 1,000 ft², the required supply air volume is calculated as 1,000 × 14,000, which equals 14,000,000 ft³. This flush-out process ensures that contaminants from construction materials are removed before occupancy, improving indoor air quality and occupant health, and the calculation is based on floor area rather than ceiling height or total building volume.